APEXEWIEXTERNAL INSULATION & RENDER
External Wall Insulation — APEX EWI

External WallInsulation.

External Wall Insulation

A multi-layer thermal envelope applied to your external walls — eliminating heat loss, cutting energy bills, and transforming your property for 25+ years.

3Types of Insulation
£500Avg. Annual Saving
10yrSystem Warranty
FreeSurvey & Quote

What Is
External Wall Insulation?

A certified multi-layer system fixed directly to the outside face of your building. Insulation boards are bonded and mechanically anchored to the wall, encapsulated in a reinforced basecoat, and finished with a durable silicone render topcoat.

Chosen by homeowners wanting to cut energy bills, eliminate cold bridging, and modernise their exterior — without the disruption of internal works.

homeSolid Wall HomeslayersCavity Wall Alternativeauto_fix_highProperty ModernisationapartmentNew Build Specification

Wall Cross-Section

Five engineered layers, fixed directly to your existing wall — from the structural substrate to the silicone render you'll see and touch.

EWI System Build-Up · Exploded View

SUBSTRATE

Exploded view of the EWI system build-up — brick substrate, adhesive, insulation board, reinforced basecoat with mesh and silicone render finish
01 · SUBSTRATE
02 · ADHESIVE
03 · INSULATION
04 · BASECOAT
05 · TOPCOAT
swipeSwipe to explore layers
SUBSTRATEStructural Wall

The existing external wall — brick, block, concrete, or stone. EWI is fixed directly to this substrate without any internal disruption. Surface condition and substrate type determine the adhesive system and mechanical fixing specification used.

01 / 05
ADHESIVEAdhesive

A polymer-modified adhesive is applied to the substrate in a specific pattern, forming the primary bond that holds the insulation boards to the wall and levelling out minor irregularities in the surface.

02 / 05
INSULATIONInsulation Board + Mechanical Fixings

The thermal core of the system. EPS (Expanded Polystyrene) is the most common choice — lightweight, dimensionally stable, and proven in EWI. Mineral wool is specified where non-combustibility is required (BR135). Board thickness is calculated to hit the target U-value. Once bonded, helical mechanical fixings are driven through the boards into the substrate — dual-fixing security for wind-load compliance.

03 / 05
BASECOATBasecoat + Reinforcement Mesh

A polymer-modified basecoat is trowelled over the insulation boards with alkali-resistant fibreglass reinforcement mesh embedded within it. This creates a rigid, crack-resistant shell that encapsulates the boards and provides mechanical key for the render topcoat.

04 / 05
TOPCOATSilicone Render Finish

The final layer — a factory-coloured silicone render in your chosen colour and grain size. Hydrophobic nano-quartz technology repels water at the surface level. Self-cleaning rain action keeps the wall looking fresh. UV-stable pigments maintain colour vibrancy for 25+ years without repainting.

05 / 05

Why EWI

EWI delivers whole-building thermal performance, weather protection, and a transformed exterior — in a single certified system.

30–40%

Energy Saving

vs uninsulated wall

25–30yrs

Service Life

10-yr manufacturer warranty

0.30W/m²K

U-Value Target

From 1.8+ baseline

80–150mm

Board Thickness

EPS or Mineral Wool

swipeSwipe to explore benefits
thermostat
CONTINUOUS INSULATIONUp to 40% energy saving

Thermal Performance

A continuous insulation envelope wraps every wall junction, eave, and corner — eliminating the thermal bridges that cause cold spots, energy loss, and interstitial condensation. U-values as low as 0.15 W/m²K are achievable with correct board specification.

Eliminates cold bridging entirely
U-value 0.15–0.30 W/m²K achievable
Certified thermal performance
01 / 04
water_drop
WEATHERPROOF SYSTEM25+ year service life

Weather Protection

The EWI system encapsulates your existing wall in a reinforced render skin engineered to resist wind-driven rain, freeze-thaw cycles, and UV degradation — protecting the underlying masonry from the elements indefinitely.

Wind-driven rain resistance
Freeze-thaw cycle durability
UV-stable render finish
02 / 04
air
THERMAL UPGRADEDew point permanently raised

Condensation Elimination

By raising the wall surface temperature well above the dew point, EWI eliminates interstitial and surface condensation. Breathable silicone render systems ensure vapour can still escape — preventing moisture accumulation within the wall structure.

Raises wall surface temperature
Eliminates surface condensation
Vapour-permeable render finish
03 / 04
home
VISUAL UPGRADE1,000+ colour options

Property Transformation

Modernise dated brick, block, or failing pebbledash facades with a fresh, factory-coloured silicone render finish. A completely transformed exterior that delivers certified thermal performance — installed in a single operation.

Smooth or textured finish
Custom RAL / NCS colour matching
10-year system warranty
04 / 04

Insulation & Colour Finish

Four insulation materials — each with distinct thermal, fire and practical characteristics — topped with a silicone render finish in the colour of your choice. The right build-up depends on your building type, wall substrate, budget and planning constraints.

swipeSwipe to compare materials
EPS Graphite (Grey EPS) insulation board

EPS Graphite

EPS Graphite (Grey EPS)

Standard residential projects and budget-conscious schemes on properties under 11 m.

λ Value

0.031 – 0.033 W/mK

Thickness

50 – 300 mm

Fire Class

E (with A2 render system)

Cost

£

  • check_circleGraphite core — improved thermal performance over white EPS
  • check_circleMost cost-effective option per m²
  • check_circleLightweight — easy to handle and cut on site
  • check_circleMoisture and rot resistant
  • check_circleWidely available in 1200 × 600 mm boards, fast lead times

Compatible wall substrates

Brick & block masonryCavity wallsConcrete panels & system-built wallsSound existing render

Suitable for

ResidentialUnder 11mStandard ProjectsBudget Schemes
01 / 04
ROCKWOOL Dual Density Slab insulation board

Rockwool

ROCKWOOL Dual Density Slab

Buildings over 11 m, fire-sensitive properties, breathable wall constructions and acoustic requirements.

λ Value

0.034 – 0.036 W/mK

Thickness

50 – 200 mm

Fire Class

A2-s1,d0 (non-combustible)

Cost

££

  • check_circleNon-combustible stone wool core — Euroclass A1
  • check_circleDual density — rigid outer skin for render key, compressible inner layer for a snug fit
  • check_circleFully vapour-permeable (breathable)
  • check_circleSuperior acoustic insulation
  • check_circleMandatory for buildings over 11 m

Compatible wall substrates

Brick & block masonryConcrete-frame & high-rise structuresSolid stone / heritage walls needing breathabilityTimber frame (vapour-open build-ups)

Suitable for

11m+ BuildingsSocial HousingFire-SensitiveBreathable Walls
02 / 04
Kingspan Kooltherm K5 insulation board

Kooltherm K5

Kingspan Kooltherm K5

Heritage properties, buildings with narrow reveals or stringent window depth limits, and highest-performance schemes.

λ Value

0.020 W/mK

Thickness

20 – 150 mm

Fire Class

B (with A2 render system)

Cost

£££

  • check_circleBest thermal performance per mm of any mainstream EWI board
  • check_circleThinnest profile — minimal window reveal loss
  • check_circleIdeal for heritage and listed buildings
  • check_circleGlass-tissue faced both sides for a strong render key
  • check_circlePremium long-term investment

Compatible wall substrates

Brick & block masonryConcrete panelsSound existing renderWalls with narrow reveals or depth limits

Suitable for

HeritageNarrow RevealsMax PerformanceListed Buildings
03 / 04
forest

Cork

Expanded Cork Board (ICB)

Eco-conscious retrofits, breathable heritage walls and natural building systems where sustainability leads the specification.

λ Value

0.038 – 0.040 W/mK

Thickness

40 – 200 mm

Fire Class

E (with A2 render system)

Cost

£££

  • check_circle100% natural and renewable — carbon-negative over its lifetime
  • check_circleFully vapour-permeable — lets moisture escape older solid walls
  • check_circleExcellent acoustic damping and thermal mass
  • check_circleNaturally resistant to mould, insects and rot
  • check_circleStable for decades with no thermal drift

Compatible wall substrates

Solid brick & stone masonryLime-rendered / heritage wallsTimber frame (vapour-open build-ups)Natural-build systems (straw, hempcrete)

Suitable for

Eco RetrofitsHeritageBreathable WallsNatural Builds
04 / 04

Installation Process

Every installation follows a strict six-stage sequence to ensure system integrity, manufacturer compliance and a lasting result.

swipeSwipe to explore stages
search
Stage 01

Survey & Assessment

Full structural survey, pull-out testing, substrate condition report, U-value calculations and SAP energy modelling. We specify the correct system for your building.

Structural survey & pull-out testing
Substrate condition report
U-value calculation & SAP modelling
01 / 06
engineering
Stage 02

Scaffolding & Prep

Access scaffolding erected, existing surfaces cleaned and treated, loose material removed, cracks repaired, existing render hacked off where required, starter tracks fixed.

Access scaffolding erected
Surfaces cleaned, cracks repaired
Starter tracks fixed level
02 / 06
layers
Stage 03

Insulation Fixed

Insulation boards adhered with polymer-modified mortar and mechanically fixed with approved anchors to the substrate specification. Boards cut around windows, doors and penetrations.

Polymer-modified adhesive bond
Approved mechanical anchor fixings
Boards cut around all openings
03 / 06
grid_on
Stage 04

Basecoat & Mesh

First pass of polymer-reinforced basecoat applied, alkali-resistant fibreglass mesh fully embedded, corners and beads reinforced, second basecoat pass to achieve level surface.

Polymer-reinforced basecoat passes
Alkali-resistant mesh fully embedded
Corners & beads reinforced
04 / 06
palette
Stage 05

Primer & Render Finish

Quartz-filled primer applied and allowed to cure. Silicone or mineral topcoat trowelled or sprayed in client's chosen colour and grain texture. Window sills, vents and trims fitted.

Quartz-filled primer cured
Silicone topcoat in chosen colour
Sills, vents & trims fitted
05 / 06
task_alt
Stage 06

Inspection & Sign-off

Full system inspection, photographic record of all stages, thermal imaging where required, warranty documentation issued, scaffold struck and site cleared.

Full inspection & photo record
Warranty documentation issued
Scaffold struck, site cleared
06 / 06
schedule

Typical Project Duration

Semi-detached: 5 – 10 daysDetached: 10 – 15 daysComplex schemes: 3 – 6 weeks

Cost & Performance

EWI costs vary by property size, substrate condition, and specification. Prices include supply, labour, scaffolding and waste disposal — your property's access and site conditions are part of why the rate per m² varies.

£90£180/ m²

Fully Installed

Includes materials, labour, render finish, reveals and 10-year system warranty. Final price confirmed after your free site survey.

info

Before you budget

Final costs factors in multiple site-specific variables, not just the wall area.

Use the figures above to plan a budget, not to fix a price. What your walls actually cost is decided on site: how scaffolding will reach them, what condition the existing substrate is in, the insulation build-up they actually need, and the finish you pick all move the number. That's why we put nothing in writing until after a free, no-obligation survey.

swipeSwipe for cost & EPC detail
tune

What Affects the Price

straighten

Property size

Primary driver

Total m² of external wall area — sets the baseline for materials and labour.

layers

Substrate condition

Variable

Sound masonry needs minimal prep; pebbledash removal or repairs add cost.

compress

Insulation thickness

Moderate

Thicker boards cost more in material, but reach lower U-values.

construction

Scaffolding complexity

Variable

Height, access restrictions and the number of scaffold lifts required.

window

Reveals & trims

Included

Window and door surround extensions are part of the standard price.

1220

Yr Payback

Typical self-funded payback — 12–15 years for terraced and semi-detached homes, up to ~20 for detached. Grants shorten it, and the system keeps saving for its 25–40 year life.

01 / 02
energy_program_saving

EPC Rating Impact

Before

After

E
F
arrow_forward
C
B

2.1 – 1.6 W/m²K

0.30 – 0.15 W/m²K

U-Value Comparison (W/m²K)

Solid brick — uninsulated

2.1

Cavity wall — uninsulated

1.6

After EWI — 100mm EPS

0.30

After EWI — 150mm Phenolic

0.15
02 / 02
calculate

Get a Fixed-Price Quote

We survey your property, specify the correct system, and provide a detailed fixed-price quotation — all free of charge, with no obligation.

Planning & Compliance

account_balance

Permitted Development

Most residential EWI installations fall under Permitted Development rights — no planning application required. Exceptions apply to listed buildings, conservation areas and some flats. We check your specific situation at survey.

gavel

Building Regulations

EWI is typically subject to Building Regulations Part L (energy efficiency). A U-value of 0.30 W/m²K or better is required for notifiable works. We calculate and document compliance as standard.

fire_extinguisher

Fire Safety (BS 8414)

Buildings over 11 m in height require A2-rated non-combustible systems. We only specify mineral wool insulation for such properties, fully compliant with BS 8414 and the Building Safety Act 2022.

verified

System Certification

All systems are BBA-certified (British Board of Agrément) and installed strictly to the manufacturer's specification. We maintain full material traceability for every project.

history_edu

Heritage Properties

For listed buildings and conservation areas, we work with planning officers to identify appropriate solutions — typically using thinner phenolic insulation and lime-compatible render systems.

workspace_premium

10-Year Warranty

Every private installation receives EWI Pro's manufacturer-backed 10-year system warranty plus our workmanship guarantee — any defect in our installation is put right. Qualifying funded schemes carry 25-year cover. Full documentation is issued at practical completion.

Recent EWI Projects

Real solid-wall installations from our portfolio — specified, installed and finished by our own team. Tap any project for the full case study.

View all projectsarrow_forward

Frequently Asked Questions

Common questions about EWI installation, planning permission, and long-term performance.

Most residential EWI installations fall under Permitted Development rights and do not require planning permission. However, listed buildings, properties in conservation areas, and flats may need prior approval. We carry out all pre-application checks as part of our survey process and advise you before work begins.

A typical semi-detached house takes 5 – 10 working days. Larger detached properties or those requiring significant substrate repairs may take 2 – 3 weeks. We provide a precise programme at survey stage. Weather is the main variable — render must be applied between +5 °C and +30 °C.

Yes. Adding insulation to the external face reduces the window reveal depth by the same amount as the insulation thickness (typically 80 – 150 mm). We account for this fully in the design — extending window sills, adjusting meter box positions, and relocating vents and air bricks as required.

EWI Pro's 10-year system warranty comes as standard on private installations, covering the full build-up — delamination, cracking and thermal performance. Qualifying funded schemes carry 25-year cover. Our workmanship is guaranteed too: any defect in our installation, we put right. All documentation is provided at completion.

EWI dramatically reduces interstitial and surface condensation by raising the wall temperature well above the dew point. However, it will not cure penetrating damp caused by defective gutters, rooflines, or failed pointing. Any moisture ingress must be identified and resolved before installation — we flag this at survey.

EPS is the most cost-effective and suits the majority of residential properties under 11 m. Mineral wool is mandatory on taller buildings and where a non-combustible system is required. Phenolic foam is specified where reveal depth is very limited or maximum thermal performance is needed from a thin profile. We recommend the correct specification during survey.

Free Survey · Fixed-Price Quote

Get Your Free Survey

Book a free survey and get a fixed-price quote within 48 hours — no obligation.

WhatsApp Us
check_circleBBA-certified systems
check_circleNo obligation
check_circle10-year system warranty